Ritesh Kumar Singh

Ritesh Kumar Singh

11 Years 9 Months Overall Experience
Manufacturing & Project Management professional with 12 years of experience in the Power, Steel, and Utilities industries. An accomplished engineer in the field of Erection and Commissioning of Thermal Power Plant, and Steel Plant Operation and Maintenance. Job Roles involved responsibilities such as material procurement and management, strategical thinking and planning, stakeholder and vendor management, and contract management.

Functional Areas

     

Education

Indian Institute of Technology, Kharagpur, India
B.Tech in Mechanical Engineering

2006-2010

Certification

Lean Six Sigma - Green Belt

2022

Bureau Veritas Certified ISO QMS Lead Auditor.

Experience

Bharat Heavy Electricals Limited.           

1 year 9 months

Deputy Manager / Power sector

June 2020 – Mar 2022

  • Executed multiple projects working with different vendors from Water Filtration System, Water Treatment System, Fuel System and others, worth Rs 25 crore.
  • Supervised completion of Demineralized (DM) water plant at Bhadradri Thermal Power Station (BTPS) within 16 months (2 months prior to planned date), costing Rs 3 crore.
  • Saved liquidity damages of Rs 50 crores at BTPS site by arranging for an alternating AC system for the Control room.
  • Transformed Inventory and resource management of various consumables and spares for various BOP packages reducing spares cost by 20%.
  • Individually managed project budget and the timeline for projects worth more than 25 crores.
  • Client-facing role involving customer training and project handover to the customer after completion of all quality and safety checks.
  • Created materials procurement contracts and labor contracts worth more than 5 crores for material acquisition and manpower management in compliance with respective state laws.

 

 

Bharat Heavy Electricals Limited.   

4 years

Senior Engineer / Power sector

June 2016 – June 2020

  • Worked for Commissioning and stakeholder management of Thermal power plant projects with worth upwards of Rs 6000 crore for a cumulative capacity of 2130 MW.
  • Added 1320 MW Power Capacity for Maharashtra and 1028 MW for Telangana by successfully commissioning Thermal Power plants. Completed 3 numbers 270 MW Thermal Plants within a span of 1 year at Telangana.
  • Developed local vendors to reduce project cycle time by10% sourcing spares locally.

 

Trichy, Bharat Heavy Electricals Limited.

5 years

Engineer / Manufacturing Unit

March 2011 – June 2016

  • Led design team of 6, for approval of technical drawings/digitization/reverse engineering.
  • Reverse engineered imported equipment reducing spare cost by Rs 1 crore.
  • Spearheaded digitalization drive by digitizing more than 200 drawings.
  • Implemented a major Process improvement project at Seamless Tube Plant, increasing production capacity by 170%.
  • Worked as operation and maintenance Shift Engineer leading a team of 15 people.
  • Redesigned equipment to reduce its downtime by 30%
  • Conducted internal departmental audits in the capacity of ISO QMS lead auditor.
Jindal Ispat Limited

9 months

Senior Engineer

June 2010 – March 2011

  • Worked as Maintenance Engineer in Caster department of Integrated Steel Plant.
  • Responsible for smooth plant operations and reducing equipment downtime.